期刊文献+

100m级薄碾压混凝土双曲拱坝施工及运行期温度场研究 被引量:1

Study on Temperature Field during Construction and Operation of 100m Grade Thin Double-curvature Arch RCC Dam
下载PDF
导出
摘要 100m以上薄碾压混凝土拱坝采取整体碾压的施工方式,内部温度受外界气温和水温变化影响敏感。因此,其在发热过程及温度变化规律等方面均较独特。通过三维有限元瞬态温度场仿真分析,得到了某100m级薄碾压混凝土双曲拱坝从施工到运行全过程温度场变化规律,为该工程的温控措施设计和控制温度应力提供了依据。 Inner temperature of 100m thin RCC arch dam is sensitive to the change of outer air and water temperature, and it has unique features in heat generation process and changing law of temperature. By 3D FEM transient simulation analysis of temperature field, the law of temperature field change of the arch dam in the whole process from construction to operation is found out , providing basis for design of temperature control and control of temperature stress in this project.
出处 《红水河》 2004年第3期40-43,共4页 Hongshui River
基金 湖北省水利厅<招徕河碾压混凝土坝仿真分析研究>
关键词 碾压混凝土 双曲拱坝 准稳定温度场 仿真计算 RCC dam double-curvature arch dam quasi-stable temperature field simulation computation
  • 相关文献

参考文献5

二级参考文献5

共引文献32

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部