广东四会市绥江大桥的维修加固工程于2002年3月16日开工,历时105天,在中国共产党建党81周年纪念日“七一”的前夕完成并通车。笔者主持了该桥施工过程质量监督工作,现就绥江大桥维修加固工程中施工遇到的技术问题及如何解决作简要的介绍。
The maintenance reinforcement work of the Suijiang bridge in Sihui city went into construction since March 16th,2002,which lasted for 105 days and was open to traffic just before 'July 1st ' of CCP'S 81 anniversary.The authors were in charge of the superwise work in the construction ,now gives some brief introduction on the technical problems and the solving methods.