文章就 3 3 41开关检修过程、检修方法及工艺、调整试验等做了详细介绍 ,并对大修中出现的问题和以后大修中应该注意的问题进行了论述。这次现场大修的成功为今后西宁供电局开展SF6开关现场大修积累了大量的、宝贵的、成功的检修经验 。
The paper makes a detailed introduction of the 3341 switch overhaul procedure, method and technics, regulating test etc, and proposes a summarize for the appeared and noticed problem in overhaul. The fulfillment of the 3341 switch spot overhaul indicates the completeness of a new task, and it will provide a plenty of valued and satisfied overhaul experience, also it will perform its own contribution for the safe operation of Qinghai power grid.