摘要 通过在Newmark 模型中引入(1)描述横向非均匀分布的纵向位移的翘曲形函数和(2)描述钢梁腹板剪切变形的Timoshenko 梁假定,建立了一个能考虑滑移、剪力滞后和剪切变形的钢-混凝土组合梁模型,并推导了均布荷载作用下的解析解。最后通过4 个算例验证了模型和解析解的正确性和适用性,并显示了考虑组合梁剪切变形的必要性。另外,算例还表明,在组合梁的三维有限元建模中采用Timoshenko 梁单元来考虑钢梁的剪切变形会导致显著的误差。 A kinematical model is proposed for steel-concrete composite beams with slip in the steel beam-concrete slab interface, shear lag in the concrete slab and shear deformation in the steel beam. A warping shape function accounting for the non-uniform transverse distribution of longitudinal displacements in the concrete slab and transverse shear deformation of the beam web are introduced into Newmark’s model. A closed-form solution for the case of uniform loading is derived. The model and the solution are then validated by means of four examples, showing the necessity of accounting for the shear deformation of composite beams. In addition, it is found that significant errors result from employing Timoshenko beam elements for the steel beam with shear deformation in 3D finite element modeling of a composite beam.
出处 《工程力学》 EI CSCD 北大核心 2005年第2期96-103,共8页 Engineering Mechanics
关键词 钢—混凝土组合梁 解析解 滑移 剪力滞后 剪切变形 steel-concrete composite beam closed-form solution slip shear lag shear deformation
  • 相关文献

参考文献12

  • 1胡少伟,聂建国.组合梁受力分析──级数法[J].力学与实践,1999,21(3):16-17. 被引量:11
  • 2Newmark N M,Seiss C P,Viest I M. Test and analysis of composite beams with incomplete interaction [J]. Proc. Society for Experimental Stress Analysis,New York,1951,9(1): 75-92.
  • 3姜绍飞,刘之洋.底包钢-火山渣混凝土组合梁在部分交互作用下的有限差分分析[J].工业建筑,1997,27(9):10-12. 被引量:6
  • 4Gjelsvik A. Analog-beam method for determining shear-lag effects [J]. J. Struct. Engrg.,ASCE,1991,113(3): 557-574.
  • 5Dezi L,Gara F,Leoni G,Tarantino A M. Time- -dependent analysis of shear-lag effect in composite beams [J]. J. Engrg. Mech.,ASCE,2001,127(1): 71-79.
  • 6Sun F F,Bursi O S. A displacement-based formulation for steel-concrete composite beams with shear lag [A]. Computational Modelling of Concrete Structures [C],A.A. Balkema Publishers,Lisse,2002. 827-838.
  • 7Villaggio P. Mathematical models for elastic structures [M]. Cambridge University Press,1997.
  • 8Reissner E. Least work solutions of shear lag problems [J]. J. Aeronautical Sci.,1941,8(7): 284-291.
  • 9Bauchau O A. A beam theory for anisotropic materials [J]. J. Appl. Mech.,1985,52: 416-422.
  • 10Song Q,Scordelis A C. Shear-lag analysis of T-,I- and box beams [J]. J. Struct. Engrg.,ASCE,1990,116(5): 1290-1305.

二级参考文献7

  • 1朱聘儒.钢-砼组合梁设计原理[M].北京:中国建筑工业出版社,1989..
  • 2聂建国.钢-砼组合梁强度、变形和裂缝的研究,清华大学博士后研究出站报告[M].,1994..
  • 3王洪全.钢上层梁叠合板组合梁纵向抗剪及极限抗弯强度的试验研究,清华大学硕士学位论文[M].,1996..
  • 4王洪全,硕士学位论文,1996年
  • 5聂建国,清华大学博士后研究出站报告,1994年
  • 6朱聘儒,钢-砼组合梁设计原理,1989年
  • 7李铁强,朱起,朱聘儒,陶懋治.钢与混凝土组合梁弯筋连接件的抗剪性能[J]工业建筑,1985(10).

共引文献13

同被引文献287

引证文献34

二级引证文献261

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部