期刊文献+

产品并行开发过程中的风险分析 被引量:2

Risk Analysis in the Concurrent Product Devleopment Process
下载PDF
导出
摘要 风险是产品开发的固有特性,本文分析产品并行开发中的风险问题。首先基于上游演化度和下游灵敏度分别建立产品并行开发中的时间函数和成本函数,并结合相关的风险分析,建立产品并行开发的时间风险和成本风险函数,并且基于这两种风险的可转化性,追求其加权和最小,保证产品开发在时间和成本两方面达到预期目标。 Risk is the inherent character of product development.The concurrent product development risk is analyzed in this paper.Based on the evolution and sensitivity,the time function and cost function are established firstly,and then time and cost risk functions are also founded.According to the two risks tradeoffs,the weight summation is minimized in order to guarantee the product development to achieve its time and cost objects.
出处 《管理工程学报》 CSSCI 2005年第2期70-74,共5页 Journal of Industrial Engineering and Engineering Management
关键词 并行工程 风险管理 产品开发 concurrent engineering risk management product development
  • 相关文献

参考文献10

  • 1Thomas A.Roemer,Reza Ahmadi,Robert H.Wang.Time-Cost Trade-offs in Overlapped Product Development[J].Operations Research,2000,48(6):858~865.
  • 2K.Clark and T.Fujimoto.Product Development Performance Strategy,Organization,and Management in the World Auto Industry[M].Harvard Business School Precess,1991.
  • 3V.Krishnan.Managing the Simultaneous Execution of Coupled Phases in Concurrent Product Development[J].IEEE Transactions On Engineering Managment,1996,43(2):210~217.
  • 4V.Krishnan,Steven D.Eppinger,Daniel E.Whitney.A Model-Based Framework to Overlap Product Development Activites[J].Management Science,1997,43(4):437~451.
  • 5Jwan-PhilippeDeschamps P.Ranganath Nayak.产品神话[M].中国人民大学出版社,2003,3..
  • 6Ali A.Yassine,Kenneth R.Chelst,Donald R.Falkenburg.A Decision Analytic Framework for Evaluation Current Engineering[J].IEEE Transactions On Engineering Management,1999,46(2):144~157.
  • 7Tyson R.Browning,Steven D.Eppinger.Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development[J].IEEE Transactions On Engineering Managment,2002,49(4):428~442.
  • 8罗伯特G库伯.新产品开发流程管理[M].机械工业出版社,2003,1..
  • 9Tyson R.Browning,John J.Deyst,Steven D.Eppinger,et al.Adding Value in Product Development by Creating Information and Reducing Risk[J].IEEE Transactions On Engineering Management,2002,49(4):443~457.
  • 10陈国权.并性工程管理方法和应用[M].清华大学出版社,1998,12..

同被引文献12

  • 1徐岩,姜澄宇,郑洪源,吴含前.并行工程中下游事件启动时刻研究[J].机械科学与技术,2005,24(1):115-118. 被引量:6
  • 2Eastman R M. Engineering Information Release Prior to Final Design Freeze [J]. IEEE Transactions on Engineering Management (S0018-9391), 1980, 27(2): 37-41.
  • 3Loch C., Terwiesch C. Communication and Uncertainty in Concurrent Engineering [J]. Management Science (S0025-1909), 1998, 44(8): 1032-1048.
  • 4Chen S J, Lin L. Decomposition of Interdependent Task Group for Concurrent Engineering [J]. Computers and Industrial Engineering (S0360-8352), 2003, 44(3): 435-459.
  • 5Juite Wang, Y.-C Hwang. A study of the impact of activity overlapping on development lead-time in design chain[J]. Joumal of the Chinese Institute of Industrial Engineers, 2005,22 (4) : 293 - 300.
  • 6Kfishnan V. Managing the simultaneous execution of coupled phases in concurrent product development [ J ]. IEEE Transactions on Engineering Management, 1996,43(2) :210 - 217.
  • 7Krishnan V., Eppinger S. D., Whitney D. E. A model-based framework to overlap product development activities [ J ]. Management Science, 1997,43 (4) : 43 - 451.
  • 8Browning T R, Eppinger S. D. Modeling impacts of process architecture on cost and schedule risk in product development [ J ]. IEEE Transactions on Engineering Management, 2002,49(4):428 - 442.
  • 9陈庭贵,肖人彬.产品开发的多输入多输出活动重叠模型研究[J].计算机集成制造系统,2008,14(2):255-261. 被引量:8
  • 10马文建,刘伟,李传昭.并行产品开发中设计活动间重叠与信息交流[J].计算机集成制造系统,2008,14(4):630-636. 被引量:26

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部