基于进度管理的项目激励机制优化研究 被引量:9

Study on optimization of project incentive mechanism based on scheduling
下载PDF
导出
摘要 对激励机制进行了准确界定,并通过构建具有激励机制的柔性资源约束型项目进度问题(FRCPSP-IM)的数学模型,分析了激励机制的优化问题.结果表明,激励机制由截至日期和激励强度共同决定,只有当截至日期位于项目工期的可行域时激励机制才是有效的,此时满足工期要求的最小激励强度即为最优的激励强度.截至日期的有效范围及对应的最优激励强度可以通过求解FRCPSP-IM来获得.最后通过数值算例对研究结果做了说明,并指出了进一步的研究方向. The conception of incentive mechanism is defined, and the mathematic model of flexible resource constrained project scheduling problem with incentive mechanism is fomulated (FRCPSP-IM) to optimum incentive mechanism. The results show that incentive mechanism comprises expired date and incentive intensity, and expired date is effective only if it lies in feasible extent of the project duration, and the minimal incentive intensity is the optimum incentive intensity. The effective extent of expired date and the corresponding optimum incentive intensity can be figured out through the model of FRCPSP-IM. Ultimately, the outcomes of the research are illustrated by the numerical value instance,and several recommendations for further research are put forward.
出处 《西安工程科技学院学报》 CAS 2005年第1期93-97,共5页 Journal of Xi an University of Engineering Science and Technology
基金 国家自然科学基金重大项目(59990470-4) 国家自然科学基金海外杰出青年基金B类项目(70028102)
关键词 项目进度 激励机制 截至日期 激励强度 柔性资源约束 project scheduling incentive mechanism expired date incentive intensity flexible resource constraint
  • 相关文献

参考文献16

  • 1何正文,徐渝,朱少英.项目融资费用分担及联合支付进度问题研究[J].系统工程,2004,22(3):15-19. 被引量:11
  • 2HERROELEN W, REYCK B D, DEMEULEMEESTER E. Resource-constrained project scheduling: a survey of recent developments[J]. Computers and Operations Research, 1998, 25(4): 279-302.
  • 3SHTUB Avraham, LEBlANC Larry J, CAI Ziyong. Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm[J]. European Journal of Operational Research, 1996, 88(1): 124-138.
  • 4Etgar Ran, SHTUB Avraham, LEBLANC Larry J. Scheduling projects to maximize net present value-the case of time-dependent, contingent cash flows[J]. European Journal of Operational Research, 1997, 96(1): 90-96.
  • 5AHN Taeho, ERENGUC S Selcuk. The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure[J]. European Journal of Operational Research, 1998, 107(2): 250-259.
  • 6KOGAN Konstantin, SHTUB Avraham. Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs[J]. European Journal of Operational Research, 1999, 118(1): 65-80.
  • 7LUH, Peter B, LIU Feng, MOSER Bryan. Scheduling of design projects with uncertain number of iterations[J]. European Journal of Operational Research, 1999, 113(3): 575-592.
  • 8KOLIISCH R, PADMAN R. An integrated survey of deterministic project scheduling[J]. Omega, 2001, 29 (3): 249-272.
  • 9DE Reyck B, HERROELEN W. The multi-mode resource-constrained project scheduling problem with generalized precedence relations [J]. European Journal of Operational Research,1999, 119(2): 538-556.
  • 10BRIAN Talbot. Resource-constrained project scheduling with time-resource tradeoffs: The non-preemptive case [J]. Management Science,1982, 28(10): 1197-1210.

二级参考文献2

共引文献10

同被引文献43

引证文献9

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部