摘要
文中结合汾河太原城区段治理美化工程河道动床模型试验,叙述了正态动床泥沙模型在模型设计中遇到的问题及处理方法和采取的措施,得到了具有应用价值的参数结果,可供类似工程设计计算采用或参考。
By way of mobile-bed model testing for Fenhe River channel in Fenhe Beautify Regulation Project in Taiyuan urban river reach, the appearing problems, disposal method and adopted measures in the model design of undistorted model are narrated, and the valuable parameter result is obtained. The result and conclusion can provide the reference to design and calculation of other similar project.
出处
《山西水利科技》
2005年第2期53-55,共3页
Shanxi Hydrotechnics
关键词
泥沙
水流
模型设计
动床模型
汾河
sediment flow model design mobile-bed model Fenhe River