人数与任务数不相等的指派问题 被引量:10

An Assignment Problem with Which the Quantities of workers and Projects Are Different
下载PDF
导出
摘要 本文提出人数与任务数不相等的指派问题应当视为一个多目标决策问题,首先要求指派给各人的任务数目两两之间相差不能超过1,其次要求所需总时间最少;并且给出了该问题的求解方法。 We have studied an assignment problem with which the quantities of workers and projects are diffe-(rent.) Every project is assigned to a worker. We put forward that this problem should be considered as a pro-(blem) of multiple objective decision making. The difference of each pair of workers' project quantities should be no more than 1. This is the first objective. Certainly, the cost must be minimal. It is the second objective. We have given a method to solve this problem in this paper.
出处 《运筹与管理》 CSCD 2005年第2期64-66,共3页 Operations Research and Management Science
关键词 运筹学 指派问题 多目标决策 匈牙利算法 解矩阵 operational research assignment problem multiple objective decision making Hungarian algorithm solution matrix
  • 相关文献

参考文献7

  • 1张莹.运筹学基础[M].北京:清华大学出版社,1994..
  • 2许国志 马仲蕃.整数规划初步[M].沈阳:辽宁教育出版社,1990..
  • 3邓成梁.运筹学的原理和方法(第二版),1995.236-244[M].武汉:华中理工大学出版社,..
  • 4顾基发 魏权龄.多目标决策问题.应用数学与计算数学,1981,1.
  • 5张文杰.邓成梁 马致山.运筹学[M].北京:中国物资出版社,1993..
  • 6Hwang C L, Yoon K S. Multiple Attribute Decision Making[M]. Springer-Verlag, 1981.
  • 7Zeleny M. Multiple Criteria Decision Making[M]. Kyoto, 1975.

共引文献10

同被引文献70

引证文献10

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部