摘要
介绍了运用模糊综合评判法进行工程项目决策阶段风险分析的过程,以工程案例为依托,建立了模糊综合评判模型,论证了该方法应用于决策阶段风险分析是可行的。
In this paper, the integrated fuzzy evaluation course of risk analysis in the period of decision making perils is illustrated. Based on engineering case, the model of was established. It is demonstrated it is feasible to analyze the risk of engineering project in decision making period.
出处
《低温建筑技术》
2005年第2期110-112,共3页
Low Temperature Architecture Technology
关键词
决策阶段
风险分析
模糊综合评判
工程项目
decision making period
risk analysis
integrated fuzzy evaluation
engineering period