摘要
在钢筋混凝土排架结构厂房改造中 ,采用托梁拔柱的方案 ,并针对工程特点 ,辅之以人工挖孔桩 ,设置附着式支承钢柱、钢托架等技术手段 ,有效地解决了该厂房改造的难题 。
The problems of reforming a mill building with reinforeced concrete bent frame can be solved effectively by a scheme of supporting beam and removing column,using adhesion supporting steel pole & bracket as well as artificial bored pile etc according to the characteristics of the project.By which the contradiction between production and construction is also solved.
出处
《工业建筑》
CSCD
北大核心
2005年第4期26-27,14,共3页
Industrial Construction