摘要
阐述了托梁拔柱这一综合性施工方法的特点及工艺原理,介绍了其主要的工艺流程及操作要点,并提出了质量控制及安全措施,经工程实践证明,其具有显著的社会效益和经济效益。
The characteristics and technical principle of the construction method of “jack beam and pulled-apart column” are introduced as well as its major technical process and operation skills. Corresponding quality control and safety measures are proposed, which acquired good social and economic benefits in practice.
出处
《山西建筑》
2005年第9期117-118,共2页
Shanxi Architecture
关键词
托梁拔柱
植筋
施工方案
jack beam and pulled-apart column, planting reinforcing bar, construction scheme