摘要
本文尝试运用系统工程的层次分析法,对影响静止式单相电能表质量的机械项目因子进行分析,并找出主要机械项目因子,为静止式单相电能表的生产、购置、检定、验收等环节的质量控制提供参考。
Though using analytic hierarchy process of system engineering, this papaer analyzes mechanism factors which effect the quality of single-phase Watt-hour meter, and finds out the primary factor. It is benefit of quality controll for single-phase Watt-hour meter manufacture, purchase, test and acceptance.
出处
《电测与仪表》
北大核心
2005年第4期27-29,共3页
Electrical Measurement & Instrumentation
关键词
电能表
质量评价
层次分析法
权重
Watt-hour meter
quality evaluation
analytic hierarchy process
weight