期刊文献+

一种有新任务到达的多卫星动态调度模型与方法 被引量:24

A Modeling and Algorithm for the New Tasks' Arriving in Multi-Satellites Dynamic Scheduling
原文传递
导出
摘要  基于动态约束满足问题,针对初始方案执行过程中任务动态到达的情况,以最大化完成任务的优先级之和,并使新任务到达后,对原方案的调整最小为目标,建立了多卫星动态调度模型,提出了模型求解方法,最后给出了仿真算例,对模型和算法进行了验证. This paper modeling the problem of multi-satellites dynamic scheduling focusing on the arriving of new tasks based on Dynamic CSP with objective to maximize the sum of tasks scheduled and minimizes the changes of the initial schedule after the all or some of new tasks insertion,. It gives a algorithm to solve the model and gives an example of the earth observation satellites to validate the model and algorithm at last.
出处 《系统工程理论与实践》 EI CSCD 北大核心 2005年第4期35-41,共7页 Systems Engineering-Theory & Practice
关键词 动态约束满足 调度 模型 算法 Dynamic Constraint Satisfaction Scheduling Modeling Algorithm
  • 相关文献

参考文献1

二级参考文献5

  • 1[1]Guffin O T, Onken J F. Generic Mission Planning and Scheduling Concepts for Space Astronomy Missions[C]. SpaceOps. 92,1992.
  • 2[2]Chien S, Rabideau G, Knight R, et al. ASPEN-Automated Planning and Scheduling for Space Mission Operations [C]. SpaceOps. 2000,Toulouse, France, 2000.
  • 3[3]Burrowbridge Sarah E. Optimal Allocation of Satellite Network Pesouces[D]. Master Thesis, 1999, 12.
  • 4[4]Jean-Claude Agnese, Pascal Brousse. Scheduling Techniques for a Constellation Visibilities[R]. AAS98-303, 1998.
  • 5[5]Greedy Algorithm[ EB]. http:∥www. c3. lanl. gov/mega-math/gloss/compute.

共引文献31

同被引文献266

引证文献24

二级引证文献157

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部