摘要 施工期间的预应力混凝土结构是时变体系。通过预应力等效荷载分析和梁板柱混凝土结构的施工阶段受力分析,计算作用于预应力混凝土结构上的荷载。将留后浇带预应力混凝土梁模拟为弹性支座梁,研究了留后浇带预应力混凝土结构施工期间的力学性能。结果表明,预应力等效荷载和施工荷载直接影响预应力混凝土结构的施工安全。 The prestressed reinforced concrete structure during construction is a time-dependent structural system.The loads acting on it include construction load and prestressed equivalent loads.Based on the theory of prestressed concrete and time-dependent structures of beam-slab-column concrete structures during construction,the loads are studied.The structures are simulated as a beam with elastic bearing, then a model is proposed for the analysis of prestressed concrete structures with a strip of post pouring concrete during construction.Study shows that construction load and prestressed equivalent loads have obvious effect on its safety during construction.
出处 《建筑结构》 CSCD 北大核心 2005年第4期50-52,共3页 Building Structure
基金 国家自然科学基金资助项目 (5 0 3 780 5 1) 中国博士后科学基金资助项目 (2 0 0 3 )
  • 相关文献

参考文献7

  • 1.混凝土结构设计规范(GB50010—2002)[M].北京:中国建筑工业出版社,2002..
  • 2.混凝土结构工程施工质量验收规范(GB50204-2002)[M].中国建筑工业出版社,2002..
  • 3王光远.论时变结构力学[J].土木工程学报,2000,33(6):105-108. 被引量:177
  • 4赵挺生,顾祥林,张誉.梁板柱体系混凝土建筑施工时变结构简化计算[J].建筑结构,2003,33(8):25-27. 被引量:3
  • 5Grundy P, Kabaila A. Construction loads on slabs with shored formwork in multistory buildings, ACI Journal, 1963,60(12).
  • 6Fang D P, Geng C D, Zhu H Y, et al. Floor load distribution in reinforced concrete buildings during construction. ACI, Journal of Structure, 2001,98(2).
  • 7Duan M Z, Chen W F. Improved simplified method for slab and shore load analysis during construction, Project report: CE-STR-95-24, Purdue University, 1995.

二级参考文献9

共引文献187

同被引文献10

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部