期刊文献+

FMS动态调度仿真模型的研究 被引量:3

Research on dynamic scheduling simulation model of FMS
下载PDF
导出
摘要 提出一种用分级思想对柔性制造系统中机床故障进行处理的新方法,运用面向对象技术和高级Petri网,建立了一个含故障处理的柔性制造系统动态调度仿真模型,该模型层次分明,故障处理流程十分简洁.提出刀具预准备思想,使得刀具准备时间与机床加工时间充分重叠,并为工件流-刀具流综合系统中实时的刀具分配提供了解决途径,在该思想基础上进一步建立了刀具流调度的数学模型和含刀具流的柔性制造系统仿真模型.仿真模型较好地反映了系统的运行情况. A new method is presented in which machine breakdown in a flexible manufacture system (FMS) can be divided into two types and a dynamic scheduling model of FMS with failure processing is set up by using object-oriented and Petri net techniques. The model is distinct and the process is succinct. An idea about tool-preparation-in-advance is also given to settle the problem of low efficiency in a tool-movement system and dynamic tool allocation in a tool-part movement system. Based on this idea a mathematical model of tool scheduling and a FMS dynamic scheduling model including tool scheduling are created which reflect the system operating process better.
出处 《哈尔滨工程大学学报》 EI CAS CSCD 北大核心 2005年第2期192-196,共5页 Journal of Harbin Engineering University
基金 黑龙江省自然科学基金资助项目(E0312).
关键词 柔性制造系统 系统建模 面向对象 刀具流系统 工件流系统 Computer simulation Mathematical models Petri nets Scheduling Tools
  • 相关文献

参考文献10

  • 1李晓鸥,余文,徐心和.基于面向对象着色Petri网的FMS仿真研究[J].计算机科学,1995,22(5):61-65. 被引量:5
  • 2MANDYANM M S.Trip-based material handling systems:throughput capacity analysis[J].IIE Transactions,1994,26(1):70—89.
  • 3KATHRYN E S. Production planning decisions in flexible manufacturing systems with random material flows[J], IIE Transactions, 1994, 26(5) : 2-17.
  • 4IORDACHE V M, MOODY O J. Synthesis of deadlock prevention supervisors using Petri nets[J]. IEEE Transactions on Robotics and Automation, 2002,18(1) : 59 - 68.
  • 5FU Shiunghsieh, SHI Chungchang. Dispatching-Driven deadlock avoidance controller synthesis for flexible manufacturing systems[J]. IEEE Transactions on Robotics and Automation, 1994, 10(2): 196-208.
  • 6LEE D, DICESARE F. Scheduling flexible manufacturing systems using Petri nets and heuristic search [J]. IEEE Transactions on Robotics and Automation, 1994, 10 (2) :123 - 132.
  • 7RAJU K R, KNISHNAH C O V. Priority nets for scheduling flexible manufacturing systems[J]. Journal of Manufacturing Systems, 1995,12(4) : 326-349.
  • 8KURAPATI V, MOHAMMAD I. Real-time Petri nets for modeling, controlling, and simulation of local area networks in flexible manufacturing systems[J]. Computers Ind Engng, 1995,28(1): 147-162.
  • 9SONG Changyong, HWRG H, KIM Y. Heuristic algorithm for the tool movement policy in flexible manufacturing systems[J]. Journal of Manufacturing System, 1995,14(3): 160 - 168.
  • 10赵葛霄.FMS环境下的刀具管理系统[J].组合机床与自动化加工技术,2000(9):45-47. 被引量:6

二级参考文献3

共引文献9

同被引文献18

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部