摘要 针对大规模SOC的测试问题,基于不同优先级、资源、芯核约束的SOC测试优化模型,引入了SOC测试调度用神经网络, 同时利用试探性随机搜索技术对神经网络进行了改进. 仿真结果表明,采用已改进的神经网络不仅能解决SOC的测试问题,而且能够在一个合理的计算时间内找到最优解,在解决SOC测试调度问题方面具有较优异的性能. To solve the large size SOC test problems, the modeling of Sytem-On-a-Chip (SOC) test optimization has been formulated with different precedence, resource and core constraints.A neural network for SOC test scheduling is firstly presented,then, a neural network combined with heuristic algorithm has been developed to solve the large size SOC test problems.As demonstrated by the results that computer implement,the developed method can not only solve the large size SOC test problems, but also be capable of finding the optimal solutions within reasonable computing time. As the result shows, it has good performance in solving SOC test scheduling problems.
出处 《江南大学学报(自然科学版)》 CAS 2005年第2期129-133,共5页 Joural of Jiangnan University (Natural Science Edition) 
关键词 系统芯片 测试调度 测试资源 试探法 SOC test scheduling test resource heuristic algorithm
  • 相关文献

参考文献9

  • 1Sugihara M, Date H, Yasuura H. A novel test methodology for core-based System LSIs and a testing time minimization problem[A].proceedings IEEE International Test Conference[C].USA:Washington DC,1998. 465-472.
  • 2Chakrabarty K.Design of system-on-a-chip test access architectures using integer linear programming[A].Proceeding of VLSI Test Symposium[C]. Candan:Montreal Quebee,2000. 127-134.
  • 3Iyengar V, Chakrabarty K. Precedence-based,preemptive,and power-constrained test scheduling for system-on-a-chip[A]. 19th IEEE Proceedings on VTS 2001[C]. CA USA: Duke Univ,2001.368-374.
  • 4Dagli CH. Artificial Neural Networks for Intelligent Manufacturing[M]. London: Chapman&Hall,1994.
  • 5Jain A, Meerran S.Job-shop scheduling using neural networks[J].International journal of production research,1998,36(5):1249-1272.
  • 6Kloypayan J, Lee Y S. Optimizing test scheduling for the System-on-a-Chip (SOC) design by neural network approach[A]. Proceedings of The 2002 Industrial Engineering Research Conference[C]. Orlando: Montreal Ouebee,2002.2282.
  • 7Chakrabarty K. Test scheduling for core-based systems using mixed-integer linear programming[J]. IEEE Transactions,2000,19(10):1163-1174.
  • 8Yang S, Dingwei Wang.Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling Neural Networks[J]. IEEE Transactions on, 2000,11(2):474-486.
  • 9Fausett L.Fundamentals of Neural Networks:Architectures,Algorithms, and Applications[M]. New jersey: Prentice Hall, 1994.

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部