摘要
火力发电厂凝结器、冷油器铜管更换前要对新铜管进行涡流检测,根据多年的检测经验。
Eddy current detection for new copper tubing should be carried out before the replacement of copper tubing of condenser and oil cooler in thermal power plant. According to detection experiences of many years, some experiences about eddy current detection of copper tubing in thermal power plant are introduced.
出处
《四川电力技术》
2005年第2期24-24,26,共2页
Sichuan Electric Power Technology
关键词
铜管
涡流检测
线圈
灵敏度
相位
copper tubing
eddy current detection
coil
sensitivity
phase