摘要
以天津地铁二期工程2 号、3 号线工程为例,对地铁厂架修车辆段分布与联络线设置进行研究,供国内城市轨道交通线网规划参考。
Taking Line 2 and Line 3 in the second-phased Tianjin subway project as examples, the article carries out research on the distribu- tion of car depots for workshop repair and intermediate repair, as well as the layout of link line, forChinese citiesusing asreference in their planning of rail transit network.
出处
《现代城市轨道交通》
2005年第1期35-37,共3页
Modern Urban Transit