摘要
介绍了离心球墨筹铁管在深圳地铁一期工程中设计、备料、安装要点和经验.
The article presents the design, material preparation, and the key points and experiences in the installation of centrifugal ductile cast iron pipe in Shenzhen subway project of the first phase work.
出处
《现代城市轨道交通》
2005年第1期38-40,共3页
Modern Urban Transit