摘要
在总结近几年来高寒地区大桥施工的难点及气候特点基础上,结合内蒙古海拉尔东大桥的施工实践。
This article describes the construction method and technology of the foundation of a large bridge built in winter, on the basis of the recent year sum-up of difficult points and climatic factors in the construction of large bridge in high and cold area, in combination with the construction practice of East Hailar Large Bridge in Inner Mongolia.