摘要
本文介绍了重点危库的综合治理。根据对该库的全面勘察分析,结合扩大库容采取的坝体排渗、排水设施的加固改造,副坝的修筑,三期排洪设施的建造等措施,保证了兰亭尾矿库的安全运行,并达到与矿山服务年限相一致,同时保有一定库容,适应远景发展的要求。
This paper introdnces the comprehensive control ways for a hazardous tailing pond. Based on the all-round surveying and analysing the pond, and teken the measures such as drainage of va-dose water from dam body, re forcing the drainage facility, building the subdam and constructing the 3rd-stage flood drainage facility,the safe exploitation of the Lanting Tailing Pond was ensured to meet the mine life and 7O% of perspective resource.
出处
《中国矿业》
1994年第4期36-38,共3页
China Mining Magazine
关键词
尾矿库
综合治理
扩容
尾矿坝
Tailing pond, Comprehensive control, Capacity raising