改扩建与技改项目评价中若干问题的再研究 被引量:1

RESEARCH ON SEVERAL PROBLEMS IN ECONOMIC EVALUATION OF RECONSTRUCTION-EXPANSION AND RENOVATION-REFORMATION PROJECTS
下载PDF
导出
摘要 本文对改扩建和技术改造项目评价方法中几个有争议的问题提出了看法:主张增量效益分析就可以进行投资决策,无需再进行总量效益分析,提出了改扩建和技术改造项目评价中的五类数据,分别指出了它们的用途,并举例说明了固定资产投资、折旧费五类数据的计算方法;分析了偿债资金来源;有项目与无项目寿命不同时的处理方法。 Some of arguable problems in Economic Evaluation of RERRP (reconstruction-expansion and renova-tion-reformation projects)are discussed and put up authorial's opinions which are that: Decision making of in-vestment may be according to incremental evaluation indexes don't necessitate to calculate indexes of afterRERRP. The data of economic evaluation of RERRP may be divided into five groups and every group ofthem has own's usage. As two examples explained calculating method of capital investment and depreciation-Analyzed capital sources for loan payback. Put up the settlement method about that when with and withoutproject have different economic life.
作者 陶树人
出处 《中国矿业》 1994年第1期69-73,共5页 China Mining Magazine
关键词 采矿工程 技术改造 经济效益 Incremental benefit analysis,Total benefit analysis,Economic evaluation of reconstruction-expansion and renovation-re formation project
  • 相关文献

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部