期刊文献+

综采工作面直接顶碎裂岩体冒顶机理及其控制 被引量:12

The Mechanism and Control of Cataclastic Rock Mass Caving of Immediate Roof on Fully Mechanized Coal Face
下载PDF
导出
摘要 本文根据直接顶岩体冒顶现场实测和相似模拟实验结果,阐明综采面破碎顶板的碎裂岩体属性与冒顶特征,并建立碎裂岩体冒顶力学模型,深入研究冒顶本质原因和控制原理。在此基础上,本文提出了有效控制碎裂岩体冒顶的指标体系与技术措施,进而在生产实践中成功地控制了碎裂岩体冒顶事故。 Based on the results of underground observations and model tests of simulated materials of immediate roof, it is expounded that fragmented roof belongs in cataclastic rock mass,and its caving characteristics is clarified in this paper too. A mechanical modelof cataclastic rock mass caving is set up,the caving cause and control principle are studiedthoroughly.In the end,the index system and technical measures to effectively control cataclastic rock mass caving are proposed, and the downtime due to cataclastic rock masscaving can be decreased successfully during coal production.
出处 《中国矿业大学学报》 EI CAS CSCD 北大核心 1994年第2期18-25,共8页 Journal of China University of Mining & Technology
基金 煤炭科学基金
关键词 碎裂岩体 回采工作面 顶板管理 cataclastic rock mass,caving arch, control index
  • 相关文献

同被引文献97

引证文献12

二级引证文献169

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部