黄壁庄水库正常溢洪道一级消力池右岸躺坡改建方案经过多次优化,达到了节约投资、缩短工程工期,保证了边界的连续性,满足工程运用要求.
The improvement plan for the right bank revetment of the first-step stilling basin for the normal spillway of Huangbizhuang Reservoir is optimized for many times, which has met the requirements to save the investment, shorten the construction period, guarantee the continuity of the boundary and satisfy the operation of the project at last.
出处
《水利水电技术》
CSCD
北大核心
2005年第4期70-71,共2页
Water Resources and Hydropower Engineering
关键词
消力池
躺坡
优化设计
黄壁庄水库
河北省
stilling basin
revetment
optimum design
Huangbizhuang Reservoir
Hebei Province