部分斜拉桥施工控制位移测点优化布置

Study on Optimal Arrangement for Displacement Measured Points in Construction Control of Partial Cable - stayed Bridge
下载PDF
导出
摘要 部分斜拉桥施工控制中常采用预埋测点来监控桥梁施工过程,为信息化施工提供比较准确的量测数据,本文以常澄高速公路某部分预应力混凝土斜拉桥为背景工程,针对测点优化展开研究,采用最小二乘法进行曲线拟合,以误差达到最小为约束条件,确定出最佳的位移测点布置方案,从而为此类方法提供理论依据并为现场施工服务。 In the construction control of the partial cable - stayed bridge, embedded measured points were commonly used to monitor the construction procedure for aquiring more accurate data, which are necessary for infor-rnationalized construction. Based on a construction of the partial cable - stayed bridge in Chang - cheng expressway , this paper adopts the least square method to carry on approximately curve with the principle of making the error to minimum, then to make out the best arrangement measurement for the displacement measured point.
出处 《现代交通技术》 2005年第2期30-32,41,共4页 Modern Transportation Technology
关键词 斜拉桥 施工控制 预埋测点 最小二乘法 位移测点布置 partial cable - stayed bridge construction control optimal arrangements measured points the least square method
  • 相关文献

参考文献1

  • 1[2]葛晓东.C/C++程序设计入门与提高[M].北京:清华大学出版社,2003.10.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部