摘要
铁路客运专线桥梁铺架技术研究与成套设备研制为国家重大技术装备研制(科技攻关)计划项目之一,参研单位结合秦沈铁路客运专线进行科研与施工实践,成功地攻克了在时速200km及以上速度的双线并置预应力混凝土箱形梁的架设和建造的技术难关,成功研制了一套架桥与造桥的系列装备,使我国桥梁施工装备与技术取得了突破性发展。系统而简要地介绍该套设备的研制情况,设备的特点、技术水平及实际应用情况。
This subject is one of the plan projects of research and manufacture of the national important technologies and equipments. Through the scientific research and constructing practice in The Qinshen Passenger dedicated railway. We had broken down the technical barrier for the great PC box beans erection and construction. Which are laid on bridges in the parallel double lines Whose traffic speeds are 200km/h and above, and We had successfully preparated a suite of related equipments, that made the bridge erection and construction equipments and technologies of our country be achieved breakthrough and reached the international actranced level at present. The status and experience above would be introduced systematically and briefly in this paper, these would be of benefit to research new products of a kind for highspeed railway construction in the next stage.
出处
《铁道标准设计》
2005年第5期32-35,共4页
Railway Standard Design
基金
国家重大技术装备研制项目(ZZ01-14-04-04)
关键词
铁路客运专线
架桥机
造桥机
成套设备
passenger dedicated railway
bridge erection
bridge construction
equipment