摘要
在繁忙的津浦线上实施大规模的抬道施工在铁路史上尚属首次,无成功的经验可以参考,无论工程数量,还是施工难度、运输组织复杂性等方面都堪称既有线施工史上之最,对路基、桥梁、线路施工关键点进行了概述。
It’s for the first time in railway history to have a large scale track raising work on busy line like Jin-Pu. Without available experience to go by, the quantity and difficulty of construction, the complexity of traffic organization tops the construction history. Here are the key points of subgrade, bridge, and track construction.