包钢2#高炉经过扩容大修,装备水平大有提高,开炉前根据2#高炉炉型特点制定了开炉方案,通过周密的组织、准备和精心操作,开炉顺利,达产速度快,比计划提前4天达产。
Through the capacity expansion, equipping level of the No.2 blast furnace is greatly elevated. A blow- in plan was worked out according to the characteristics of the shape of the furnace before re - start of it. Because of careful organization, preparation and skilful operation, the production target was got 4 days earlier than planed.
出处
《包钢科技》
2005年第2期6-8,54,共4页
Science & Technology of Baotou Steel
关键词
高炉扩容
开炉
达产
capacity expansion of blast furnace
furnace blow - in
reaching production target