期刊文献+

风电场最大装机容量和电网短路容量的关系 被引量:24

The Relationship Between Wind Farm Maximum Capacity and Short-Circuit Capacity of the Power Grid
下载PDF
导出
摘要 解释电网短路容量与风电场最大装机容量的关系,通过算例分析来说明根据风电场装机容量与公共连接点短路容量的比值K确定风电场装机容量的局限性。指出在K值相同时,风电场引起的电压变化还与电网阻抗角和风电场功率因数有关。对确定风电场装机容量时需要计算的内容提出建议。 This paper explains the relationship between wind farm maximum capacity and short-circuit capacity of the power grid, it then points out the limitation of the K-based method for determining the wind farm capacity via a sample case stady. The simulation demonstrates that even though K value is same, the power grid impedance angle and wind farm power factor may also affect the voltage variation which is caused by wind farm. Finally, some recommendations are suggested for determining wind farm capacity.
出处 《国际电力》 2005年第2期31-34,共4页
关键词 风力发电 风电场 装机容量 电网 短路容量 电力系统 潮流计算 power system wind power short circuit ratio voltage deviation
  • 相关文献

同被引文献284

引证文献24

二级引证文献299

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部