摘要
结合钻孔灌注桩的施工工艺流程,从施工准备、施工过程及施工验收三个阶段入手,提出了钻孔灌注桩施工质量的控制措施,以利于做好施工全过程的管理工作,确保工程质量。
Combined with procedure of constructive techno lo gy of hole-digging grouting pile,it puts forward control measures of constructi ve quality of hole-digging grouting pile from three phases of constructive prep aration、constructive process and checkup so as to be good for doing well in man agement work & guaranteeing project quality.
出处
《山西建筑》
2005年第10期42-43,共2页
Shanxi Architecture
关键词
钻孔灌注桩
质量控制
钢筋笼
钻孔
hole-digging grouting pile, quality control, s teel bar case, hole-digging