摘要
通过介绍泵站自动化在工程应用当中的一个实例,指出设计人员容易忽略的问题:软件开发使用以太网发布技术,相应的PLC选型也要配置以太网接口,否则很难保证远程监控系统执行指令的效率。
By introducing the applied engineering sample in the field of the pumping station automatization,this paper indicates that the design engineer often ignore the problem: if the software programming is based on Ethernet,then the corresponding PLC type will configure the Ethernet interface,otherwise it is very difficult that the long-distance monitoring system effectively execute the instructions.
出处
《工业控制计算机》
2005年第5期71-72,共2页
Industrial Control Computer