摘要
工程设计中需要进行多方案比较,每个方案又由多项目标组成。选择出最佳的组合方案,使设计方案达到优化,这是模糊数学问题。采用传统的或经典的数学方法,有时得不到理想的结论。采用模糊数学方法,使这一问题得到较好的解决。
It is needed to compare a few schemes in engineering design, select the best scheme, and make it optimization, which is a typical fuzzy mathematical problem. It is hard to give out perfect conclusion to use classical mathematics,but this problem will be solved by using fuzzy mathematics method.
出处
《中国矿山工程》
2005年第2期35-37,共3页
China Mine Engineering