PERT技术在计算机网络工程中的应用 被引量:3

Application of PERT technique in the computer network engineering
下载PDF
导出
摘要 阐述了PERT基于概率的正态分布理论,对于工程项目中的作业完成时间按三种不同情况进行估计:乐观时间、最可能时间、悲观时间,并假定这三个估计服从正态分布;并结合案例计算导出网络工程项目完成计划工期的概率方法。且分析论证了项目工期具有不可压缩性的最小周期的客观规律以及对项目计划的指导意义。 This paper expounds PERT based on the normal distribution theory of probability.The time that is finished in the homework of the engineering project is estimated, according to three kinds of methods,optmistic time, possible time,and pessimism time;sopposing that they satisfy the normal distribution.It derives the pro-(bability) methnod for the network project finishment time from some examples, and analyzes and demenstrats the objective law of mininum period in which project time has the periods that does not compress.This method has a guide meaning to the project.
出处 《信息技术》 2005年第4期42-44,共3页 Information Technology
关键词 项目计划 数学期望 方差 决策 project plan mathematics expectation square difference decision-making
  • 相关文献

参考文献2

  • 1盛骤 谢式千.概率论与数理统计[M].北京:高等教育出版社,1989.189-194.
  • 2张海藩.软件工程导论[M].北京:清华大学出版社,2000..

共引文献158

同被引文献15

引证文献3

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部