建设项目的环境经济效益分析

The Benefit Analysis of Construction Project by Means of The Environmental Protection and Economics
下载PDF
导出
摘要 以克拉玛依市锅炉房改造项目为例,采用环境经济学的价值计算原理,动态的经济分析方法对改造项目的经济和社会环境效应进行了核算,该项目环境保护投资与基本建设投资比例为5.6%,净现值778.3>0,费效比1.41>1,说明其环境经济效益较好。 Taking the boiler room remolding project in Kelamayi as an example, adopt the principle for value calculation in environmental economics; static and dynamic methods of economic analysis were used to assess the economic and environmental effect related to the project. The ratio of the investment between environmental protection and basic infrastructure is 5.6 percent; the result is in accordant with the related national standard. Net Present Value of the project is 778.3, and Benefit-cost ratio is 1.36. All the results show the project has a good environmental and economic effect.
出处 《新疆环境保护》 2005年第1期51-53,共3页 Environmental Protection of Xinjiang
  • 相关文献

参考文献4

二级参考文献6

  • 1环境影响评价高级培训系列教材编写指导委员会.化工石化及医药行业建设项目环境影响评价(试用)[M].国家环境保护总局监督管理司,2001,5..
  • 2国家环境保护总局.环境影响评价技术导则总则大气环境地表水环境(HJ/T2.1-2.3-93)[M].国家环境保护总局,1993..
  • 3国家环境保护总局.环境影响评价技术导则声环境(HJ/T2.4-95)[M].国家环境保护总局,1995..
  • 4国家环境保护总局.环境影响评价技术导则非污染生态影响(HJ/T19-1997)[M].国家环境保护总局,1998..
  • 5经济合作与发展组织(OECD).环境项目和政策的经济评价指南[M].中国环境科学出版社,1996,9..
  • 6国家环境保护总局开发监督司.中国环境影响评价培训教材[M].化学工业出版社,1999,11..

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部