期刊文献+

利用AB法的A段处理低浓度市政污水

Use of A-stage in AB Process for Treatment of Low Strength Municipal Wastewater
下载PDF
导出
摘要 白沙门污水处理厂4年多的运行表明,利用AB法的A段处理低浓度市政污水时可获得较好的净化效果,但系统的DO、泥龄等参数变化区间窄小,当受到溶解性有机负荷冲击时易引发高粘性污泥膨胀。针对原辐流式中沉池易出现短流的情况,增设了一级稳流装置,使出水水质得到了明显改善。 The Baishamen Wastewater [JP2]Treatment Plant has operated for four more years. The opera-[JP]tional experiences show that use of A-stage in AB process for treatment of low strength municipal wastewater can get better treatment effect. However, due to narrow variation range in the parameters such as DO and sludge retention time, the system is liable to suffer the dissolved organic shock loading, which results in the high sticky sludge bulking. Because of the frequent occurrence of short-circuiting current in radial-flow type mid-clarifier, an additional primary steady flow device is set up, which is helpful to great improvement of effluent quality.
出处 《中国给水排水》 CAS CSCD 北大核心 2005年第6期98-100,共3页 China Water & Wastewater
关键词 AB法 A段 中沉池 低浓度市政污水 AB process A-stage mid-sedimentation tank low strength municipal wastewater
  • 相关文献

参考文献3

二级参考文献9

共引文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部