期刊文献+

以可靠性为中心的维修的经济效益评估模型 被引量:7

The Evaluation Model for Economic Benefits of Reliability-centered Maintenance
原文传递
导出
摘要 以可靠性为中心的维修(Reliability centeredMaintenance,RCM)的经济效益评估模型是国内外首次系统、全面、简单、有效评估核电站维修优化成果的方法。本文从RCM经济效益评估内容和分类着手,详细介绍了分析后取消项目、增加项目显性及隐性经济效益评估模型,并结合大亚湾核电站现状进行了实证应用与分析。 This evaluation model for economic benefit of Reliability-centered Maintenance (RCM) is the first time at home and abroad to be applied systemically, completely, simply and effectively to evaluate the maintenance optimization results of a nuclear power station. The paper explains the contents of economic benefits and their classification, then gives detailed explanations of how benefits are evaluated for elimination of tasks and for both the evident and the hidden benefits of newly created tasks, along with examples of this model as applied at Daya Bay Nuclear Power Station.
出处 《工业工程与管理》 2005年第3期110-114,共5页 Industrial Engineering and Management
关键词 经济效益 评估模型 RCM 分类 可靠性 benefit evaluation model RCM classification reliability
  • 相关文献

参考文献10

  • 1Moubray J. Reliability-centered Maintenance [ M ]. New York:INDUSTRIAL PRESS INC, 1992.
  • 2Moloney R. About the Evaluation on the Economic Benefit of RCM [ R ]. 2003.
  • 3暂云龙.大亚湾核电站生产管理丛书[M].北京:原子能出版社,2003..
  • 4.大亚湾核电站概率安全评价报告[R].,2004..
  • 5Lee. Reliability Centered Maintenance FRAMATOME-ANP Approach [ Z ]. WANO-Tcworkshop on Risk Informed Maintenance,2001
  • 6Choi K-H. Analysis of Reliability Centered Maintenance and future plan in Korean NPPs [ Z ]. WANO-Tcworkshop on Risk Informed Maintenance, 2001.
  • 7SAE (JA1011). Evaluation Criteria for Reliability Centered Maintenance(RCM) Processes[ S]. 1999.
  • 8.广东大亚湾核电站岭澳核电站生产运行年鉴2001[M].北京:原子能出版社,2002.282.
  • 9.广东大亚湾核电站岭澳核电站生产运行年鉴2002[M].深圳:海天出版社,2003.187.
  • 10.广东大亚湾核电站岭澳核电站生产运行年鉴2003[M].深圳:海天出版社,2004..

共引文献2

同被引文献34

引证文献7

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部