摘要
针对中间包永久层施工方法的缺陷,在充分发挥现有设备性能的基础上,通过技术改造,达到减少职工劳动强度、提高作业效率、降低材料消耗的目标。
In view of defects of construction for tundish permanent layer and based on the current facilities property, the technical renovation was made to decrease the working strength of staffs, enhance the working efficiency and reduce the consumption of materials.
出处
《天津冶金》
CAS
2005年第3期28-29,共2页
Tianjin Metallurgy