摘要
结合南昌生米大桥32号墩承台单壁钢吊箱施工的工程实践,介绍大型单壁钢吊箱的设计与施工的重点、难点。
According to the design and construction of steel single wall suspended caisson in No.32 base slab of NanChang Shengmi Bridge ,this paper briefly introduced the point of design and construction of large steel single wall suspended caisson and provided the certain reference for the construction of similar aquatic engineering.
出处
《铁道标准设计》
2005年第6期58-60,共3页
Railway Standard Design
关键词
单壁钢吊箱
承台
封底
施工
single-wall hanging box
pile cap
bottoming
construction