摘要
结合福州—双龙TCSC可行性研究,具体分析了TCSC设备对差动保护、距离保护、零序保护、自动重合闸等设备的影响并提出了相应的解决办法。
The infection of TCSC on Fu-Shuang transmission line to relay protections with various principles has been analyzed,such as differential relay,distance relay,zero-sequence relay and auto rechoser.Base on that analysis,reasonable relay configuration has been rpompted.
出处
《华东电力》
北大核心
2005年第5期55-58,共4页
East China Electric Power