摘要
绍兴污水处理厂二期工程由多组大型的污水池组成。概括介绍了该工程设计中的技术难点和相应的设计措施。
Shaoxing sewage treatment plant project phase two consists of many sets of large sewage tanks. The article briefs technical difficulties in design and measures taken.
出处
《中国建筑防水》
2005年第6期24-25,共2页
China Building Waterproofing
关键词
污水池
防渗
耐久性
sewage tank
leak prevention
durability