青州纸厂热电站技改工程机组选型及其经济性分析 被引量:1

Equipment Selection and Economic Analysis of the Thermal Power Plant in Qingzhou Paper Mill
下载PDF
导出
摘要 本文对青州造纸厂浆、纸产量增长后的用热电负荷进行预测,按“以热定中”的原则对增容改造后热电站运行参数,机组型式进行了选择比较。在机组容量允许的情况下尽量选用高一级的蒸汽参数,将获得较好的经济效益。 According to the prediction of heat and power consumption of the Qingzhou Mill with expanded capacity,and based on the principle of that the power output will be determinded by the heat consumption,comparison and selection of the operations and selected as higher as the TPP capacity is permitted in order to achieve the better benefit.
机构地区 青州造纸厂
出处 《中国造纸》 CAS 北大核心 1994年第5期23-26,共4页 China Pulp & Paper
关键词 热电站 技术改造 机组 选型 造纸厂 thermal power plant,equipment selection,economic analysis
  • 相关文献

同被引文献5

  • 1Jim Kenny.Top10:Recovery Is in the Air But Profits Remain Thin[J].Solution!,June,2005:28~32.
  • 2Johan Gu llichsen,Carl-Johan Fogelholm.Chemical Pulping,Papermaking Science Technology[M].Book6,Chapter16,16-4,Heat & Power Balance of Pulp Mill.
  • 3Johan Gullichsen,Carl-Johan Fogelholm.Chemical Pulping,Papermaking Science Technology[M].Book6,Chapter16,16-5.1,Heat & Power Balance of Newsprint Production.
  • 4Johan Gullichsen,Carl-Johan Fogelholm.Chemical Pulping,Papermaking Science Technology[M].Book6,Chapter16,16-5.2,Heat & Power Generation of SC and LWC Production.
  • 5Johan Gullichsen,Carl-Johan Fogelholm.Chemical Pulping,Papermaking Science & Technology[M].Book6,Chapter16,Heat & Power Co-generation,16-2,Heat & Power Demand in Pulp and Paper Making.

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部