惠州深能源丰达电厂取水工程水锤计算与防护 被引量:2

Calculation and Prevention for Water Hammer in Water Intake Project of Huizhou Shennengyuan Fengda Electric Power Plant
下载PDF
导出
摘要 采用特征线法对广东省惠州深能源丰达电厂取水工程进行了水锤计算。因工程采用的是弹性模量较小的玻璃钢夹砂钢管,且管线末端安装的水处理的螺旋混合器消磨了部分水锤能量,故管道中水锤压力较小,但管线两端负压较大。计算表明在管道上设置三个单向调压塔能起到较好的负压防护效果。 The water hammer in water intake project of Fengda electric power plant is calculated by themethod of characteristic line. As the GRP sand inclusion steel pipes with low elastic modulus are adopted, andthe water treatment mixing screw set at the end of pipeline wears down a part of water hammer energy, so getlow positive water hammer pressure in the water supply system. But high negative pressure is likely to happenat the both ends of the pipeline in case of a serious pump-stopping water hammer. The results show that it iseffective to prevent the negative water hammer pressure by setting three one-way surge tanks in pipeline.
出处 《排灌机械》 2005年第1期15-18,共4页 Drainage and Irrigation Machinery
关键词 泵站 水锤 单向调压塔 负压防护 Pumping station Water hammer One-way surge tank Negative pressure prevention
  • 相关文献

参考文献3

  • 1[美]E.B.怀利 V.L斯特里特.清华大学流体传动与控制教研组译.瞬变流[M].北京:水利电力出版社,1983..
  • 2GB/T50265-97.1977.泵站设计规范.[S].,..
  • 3[日]日本农业土木事业协会 丘传忻 林中卉译.泵站工程技术手册[M].北京:中国农业出版社,1988..

共引文献1

同被引文献5

引证文献2

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部