摘要
针对非洲尼罗河的特点,通过对中方为苏丹设计的吉利联合循环电站尼罗河取水系统不同方案的分析论述,提出了特定条件下选择取水点以及取水构筑物方案的设计原则。经过运行实践证明,整个泵船及引桥工艺布置设计经济合理,泵船的现场组装、调试和运行情况良好。对今后国内外类似工程的设计提供参考。
Aimed at the performance of Nile River in Africa, design principles by choosing better water intake scheme and site are presented under the given conditions on the Sudan Elgaili Combined-cycle Congeneration Power Station. The system has been operated more than one year and half, and the facts have been proved that the design of water intake system is economical and excellent. It has some reference value for domestic and oversea projects.
出处
《吉林电力》
2005年第1期6-8,35,共4页
Jilin Electric Power
关键词
取水建筑物
河流
泵船
稳定性
引桥
water intake building
river
ships for pump
stability
intake bridge