摘要
本文以铅管拉拔式毫秒延期非电雷管为例,阐述了影响延期非电雷管秒量的各种因素,并通过试验和生产实践得到了证明,为延期非电雷管的设计及生产质量控制提供了一定的依据。
Influence factors of time of nonel detonators with delay characteristics are analyzed through the discussion of lead tube drawing type of nonel detonators with delay characteristics. Analysis results are verified in test and production, which are the foundation of nonel detonator design and production quality control.
出处
《煤矿爆破》
2004年第3期11-13,共3页
Coal Mine Blasting
关键词
非电雷管
发火原理
秒量
影响因素
nonel detonator detonating theory delay time influence factors