摘要
介绍了低道床电阻区段自动闭塞的3 种实现方案, 详细阐述了实现过程中的相关工程问题, 并给出了进一步完善的建议。
Three implementation methods of automatic block within low ballast bed resistance section are introduced. Related engineering issues during construction are demonstrated in details. And some suggestions are given for further improvement.
出处
《铁道通信信号》
2005年第6期14-16,共3页
Railway Signalling & Communication