摘要
本文叙述了混凝土坝施工期在度汛过程中,不同施工阶段坝体过流流态,对坝体、下游消能工和防冲建筑物、河床、岸边等可能产生的影响。并建议必要时采取有效措施,保证度汛安全和减小工程损失。
This paper narrates the overflow cross the dam in the different stages under concrete damconstruction period during the flood season,and creates the influence to the dam,downstream,hydraulic structure,river bed,bank and so on,and suggests some means to guarantee the dam safety during the flood season and reduce the project loss.
出处
《吉林水利》
2005年第6期26-28,共3页
Jilin Water Resources
关键词
混凝土坝
度汛
缺口过流
冲刷
the concrete dam
safety during the flood season
the breach flow
scour