摘要
烧结矿配料生产要在满足高炉需求的情况下追求成本最小。本文介绍了使用电子表格线性规划模型寻找最优的配矿方案,使所得配料的所有化学成分接近给定值。
The production of sinter mixing material shall be carried out in the lowest cost in conformity with the demand of blast furnace. This article describes that all the chemical composition of the mixed material can reach the given value, by using Linear Programme in Microsoft Excel to search for optimization mixing material project.
出处
《冶金丛刊》
2005年第3期4-7,共4页
Metallurgical Collections