介绍了在海淤泥层采用半机械化半人工顶管的一些施工经验,论述了如何合理确定顶力、顶进过程中顶管的纠偏以及如何防止地面沉降,解决了在海淤泥层不宜顶管的难题。
This paper introduces some experiences of adopting the semi-mechanized and semi-annual jacking-pipe in the sea sludge layer, and discusses on how to determine rationally the jacking force, how to make the deviation rectification of the jacking-pipe in the course of the jacking, and how to prevent the ground subsidence, which solves the puzzle of that is difficult to jack the pipe in the sea sludge layer.
出处
《科技情报开发与经济》
2005年第10期250-251,共2页
Sci-Tech Information Development & Economy
关键词
海淤泥层
污水截流
管网
顶管施工
地面降沉
sea sludge layer
sewage cut-off
pipeline
construction of jacking-pipe
ground subsidence