摘要
本文通过对黄河上水电站梯级日优化运行的计算分析,展示从多方面提高日运行经济效益的途径和具体计算方法。方法和程序对此类课题有普遍参考价值。
This paper demonstrats the way of raising up economic effect of daily operation in multiple aspects and the approach of optimizing the operation of hydroelectric cascade through practi cal example of calculation of Liujiaxia, Yanguoxia and Bapunxia hydroelectric plants on Yellow River. All items concerning this problem are dealt with and resolved in one program. The method and program can give a reference to other hydroelectric cascades.
关键词
梯级水电站
日
优化
运行
cascade hydroelectric station
daily
optimization
operation run