摘要
结合沿海地区软弱围岩浅埋暗挖矩形隧道施工,使用有限差分软件FLAC对分部开挖进行非线性数值模拟,研究矩形隧道初期支护在开挖过程中大变形机制。分析结果表明,围岩和初期支护的应力应变是非线性不可逆过程,其开挖方案应采用软弱围岩非线性大变形力学设计方法,以确保开挖施工安全。
Combining construction of a soft adjacent rock shallow buried covered excavation rectangle tunnel in coastal area, authors used a finite difference software, FLAC, to make a nonlinear numerical simulation of the divisional excavation, studied the large deformation mechanics of early supports of the rectangle tunnel in the excavation process. Analysis results indicate that the change of stress and strain of adjacent rocks and early supports is a nonlinear non-reversible process, and that the excavation plan adopting soft adjacent rock nonlinear large deformation mechanical design methods can ensure construction safety.
出处
《施工技术》
CAS
北大核心
2005年第6期4-6,共3页
Construction Technology
关键词
隧道工程
数值模拟
非线性
软岩
浅埋
tunnel engineering
numerical simulation
nonlinear
soft rock
shallow buried